RETTEW completed a cooling system upgrade analysis and conceptual design engineering for Joy Cone Company where we identified significant savings opportunities for the system design they needed. The design was...
Read More
A leading manufacturer of commercial boilers and related heating, ventilating, and air conditioning products that has been in business for more than 150 years had been operating under outdated workplace...
Read More
A meat packaging facility wanted to modify their multivac sealing and packing machinery to allow for safe lock-out/tag-out (LO/TO) of any moving pieces of equipment while keeping the control system...
Read More
A construction firm was assembling a new furnace during a large-scale construction project at a local steel mill. The furnace would yield faster and more efficient bloom reheating, increasing the...
Read More
RETTEW completed an industrial site decommissioning assessment of the 30-acre Federal Mogul/NTN-BCA former ball bearing manufacturing facility, including a 277,000-SF industrial building. When fully operational, manufacturing processes at the site...
Read More
Furmano Foods needed to ensure that their operations were in compliance with environmental regulations and requirements, and wanted a single all-encompassing system that tracked environmental compliance and reporting items as...
Read More
The gateway to a prominent business area, Greenfield Corporate Center’s expansion was an important development project that would render the site completely built out. As the last undeveloped area within...
Read More
To be competitive in today’s manufacturing industry, companies have to constantly monitor and improve their equipment, production levels, and safety performance — all of which are aspects of a high-risk...
Read More
Our client, the largest wholesale fertilizer distributor in the northeast and mid-Atlantic, wanted to expand their feed mill at its current location, rather than moving operations to a new site....
Read More
Knouse Foods, a long-standing RETTEW client, requested boundary surveys with specific title commitment requirements for their six processing plant sites. This assignment required extensive boundary surveys of hundreds of acres...
Read More