News & Insights

  • February 18, 2025
I-80-B42

I-80, Section B42 Resurfacing and Preservation

Interstate 80 (I-80) in Pennsylvania runs for 311 miles across the central part of the state. While this highway does not serve any major cities in Pennsylvania, it is a...

Read More
  • February 18, 2025
I-80-sections 124, 129, 159 160

I-80, Sections 124, 129, 159, and 160

Under an open-end agreement with Pennsylvania Department of Transportation District 3-0, RETTEW prepared preliminary engineering, final design, and a final cost estimate within 1 percent of the bid for the...

Read More
  • October 9, 2024
Sonic Drilling

PENNDOT Maintenance Facility Site Investigation and Remediation

RETTEW addressed persistent groundwater contamination at a Pennsylvania Department of Transportation (PennDOT) maintenance facility, stemming from previous operations involving a diesel underground storage tank. Despite PennDOT’s prior attempts, achieving regulatory...

Read More
  • October 9, 2024
SR 0034 Roundabout

SR 0034 Intersection Improvements

The intersection of SR 0034, SR 0850, and Pisgah State Road in Shermans Dale was plagued with a significant number of traffic accidents. The four-legged intersection posed serious safety risks,...

Read More
  • October 9, 2024
SR0443 Bridge

SR 0443 Bridge Replacement

Replacing this twin-barrel arch bridge on a heavily traveled corridor posed significant challenges because of the limited crossings of the waterway and the need to maintain traffic flow. RETTEW designed...

Read More
  • January 24, 2024
Big Conestoga 1 Bridge

Big Conestoga #1 Bridge Replacement

RETTEW worked with Lancaster County for more than a decade to prioritize rehabilitation and replacement of their structurally deficient bridges. The Big Conestoga #1 Bridge was the last remaining bridge...

Read More
  • January 24, 2024
Elizabethtown trail

Elizabethtown Borough Bike/Pedestrian Pathway Extension

Elizabethtown Borough wanted to complete the pathway network within the borough that was part of a phased planning, design, and construction project reflecting the Regional Official Map for Trails as...

Read More
  • January 24, 2024
former service station

Former Service Station Monitoring and Characterization

RETTEW conducted a site characterization and remedial action of a former automobile service and fueling station property acquired by the Lehigh-Northampton Airport Authority (LNAA). Upon acquisition, historical regulatory obligations related...

Read More
  • January 24, 2024
Airport environmental

Lehigh-Northampton Airport Authority Environmental Consulting Services

Since 2015, RETTEW has provided Lehigh-Northampton Airport Authority (LNAA) and Lehigh Valley International Airport (ABE) with industrial National Pollutant Discharge Elimination System (NPDES) consulting, compliance, and permitting support. The initial...

Read More
  • January 24, 2024
SR 172 Intersection

SR 172 Perry Drive Intersection Improvements

The intersection of SR 172 and Perry Drive was on Ohio’s Governors priority list of the top ten most dangerous intersections in the state and needed significant upgrades to increase...

Read More