News & Insights

  • November 20, 2025
Enslow Boulevard Bridge

Enslow Boulevard Bridge Replacement

RETTEW provided final design services for the replacement of the existing Enslow Boulevard Bridge. A critical access point for the local community, the bridge required replacement because of age and...

Read More
  • February 18, 2025
I-80-B42

I-80, Section B42 Resurfacing and Preservation

Interstate 80 (I-80) in Pennsylvania runs for 311 miles across the central part of the state. While this highway does not serve any major cities in Pennsylvania, it is a...

Read More
  • February 18, 2025
I-80-sections 124, 129, 159 160

I-80, Sections 124, 129, 159, and 160

Under an open-end agreement with Pennsylvania Department of Transportation District 3-0, RETTEW prepared preliminary engineering, final design, and a final cost estimate within 1 percent of the bid for the...

Read More
  • October 9, 2024
Sonic Drilling

PENNDOT Maintenance Facility Site Investigation and Remediation

RETTEW addressed persistent groundwater contamination at a Pennsylvania Department of Transportation (PennDOT) maintenance facility, stemming from previous operations involving a diesel underground storage tank. Despite PennDOT’s prior attempts, achieving regulatory...

Read More
  • October 9, 2024
SR 0034 Roundabout

SR 0034 Intersection Improvements

The intersection of SR 0034, SR 0850, and Pisgah State Road in Shermans Dale was plagued with a significant number of traffic accidents. The four-legged intersection posed serious safety risks,...

Read More
  • October 9, 2024
SR0443 Bridge

SR 0443 Bridge Replacement

Replacing this twin-barrel arch bridge on a heavily traveled corridor posed significant challenges because of the limited crossings of the waterway and the need to maintain traffic flow. RETTEW designed...

Read More
  • January 24, 2024
Big Conestoga 1 Bridge

Big Conestoga #1 Bridge Replacement

RETTEW worked with Lancaster County for more than a decade to prioritize rehabilitation and replacement of their structurally deficient bridges. The Big Conestoga #1 Bridge was the last remaining bridge...

Read More
  • January 24, 2024
Elizabethtown trail

Elizabethtown Borough Bike/Pedestrian Pathway Extension

Elizabethtown Borough wanted to complete the pathway network within the borough that was part of a phased planning, design, and construction project reflecting the Regional Official Map for Trails as...

Read More
  • January 24, 2024
former service station

Former Service Station Monitoring and Characterization

RETTEW conducted a site characterization and remedial action of a former automobile service and fueling station property acquired by the Lehigh-Northampton Airport Authority (LNAA). Upon acquisition, historical regulatory obligations related...

Read More
  • January 24, 2024
Airport environmental

Lehigh-Northampton Airport Authority Environmental Consulting Services

Since 2015, RETTEW has provided Lehigh-Northampton Airport Authority (LNAA) and Lehigh Valley International Airport (ABE) with industrial National Pollutant Discharge Elimination System (NPDES) consulting, compliance, and permitting support. The initial...

Read More