Aethon Energy Management, LLC, owns and operates natural gas and oil assets in the Wind River Region of Central Wyoming, including more than 250 active wells. As part of their...
Read More
As part of a major expansion project, Fulton Bank wanted to promote water reuse at its new 120,000-SF, eight-story headquarters building in downtown Lancaster. The project looked to maximize the...
Read More
Recovering produced water as a high-quality water resource for oil and gas exploration is an emerging trend, with several operational facilities in the United States. RETTEW has been involved in...
Read More
Tobyhanna Army Depot is the designated site for repairing and testing Marine Corps radars. To accommodate upcoming work on an AN/TPS-59 long-range air surveillance radar antenna, Tobyhanna needed to complete...
Read More
West Penn and Walker Townships required an Act 537 sewage facility plan update. The previous engineering firm for the Townships prepared an update study over the course of four years,...
Read More
The client’s outdated aeration system controls and UV system had a history of malfunctions and failure. Poor control strategies and lack of equipment understanding had created a situation where neither...
Read More
Pennsylvania Department of Environmental Protection required the Highspire Borough Authority to upgrade its wastewater treatment plant to meet biological nutrient removal requirements as part of Pennsylvania’s Chesapeake Bay Tributary Strategy....
Read More
Looking to be at the forefront of advanced water treatment (AWT) and reuse in Pennsylvania, the University Area Joint Authority (UAJA) wanted to upgrade its disinfection process for its water...
Read More
The University Area Joint Authority (UAJA) owns and operates a 10.5-mgd advanced wastewater treatment facility. This facility serves the greater State College area, known as the Centre Region, and outlying...
Read More
The University Area Joint Authority had an outdated transformer that required an emergency replacement. In an effort to avoid continuous generator failures, the client needed to safely replace outdated equipment...
Read More