The Marine Corps Base Quantico needed to perform soil borings in 21 locations on its wastewater treatment plant premises. However, the presence of underground utilities posed a risk of damage...
Read More
RETTEW performed a complete subsurface utility mapping survey to determine the location of utilities within 50 feet of the path of a proposed fiber optic duct bank around a medical...
Read More
The Municipal Authority of the Town of Bloomsburg was experiencing significant infiltration and inflow of stormwater to their sanitary system, which was overwhelming their downstream wastewater treatment facilities. Under budgetary...
Read More
After experiencing abnormally hot water in a potable cold water supply line, an industrial client needed to find the source of a steam leak along a 40-foot length of buried...
Read More
For decades, key University of Pittsburgh personnel kept the Bradford Campus facilities and construction projects running smoothly by managing and cross-referencing numerous hardcopy and electronic utility plans and maps that...
Read More
A high-pressure natural gas pipeline located in a right-of-way between two existing pipelines required inspection to evaluate potential flaws and any need for repair. Prior to excavation, the client needed...
Read More
A midstream natural gas company operating in Ohio’s Utica Shale region was mapping existing natural gas lines and wanted to protect their established infrastructure and ensure no utility line hits...
Read More
An exploration and production client acquired a 37-mile natural gas pipeline collection system that had been depressurized and shut down for more than two years. Prior to reactivating and bringing...
Read More
- April 12, 2017
- Uncategorized
A leading provider of healing services for children and families in central and southwestern Ohio planned construction activities in sections of their property. The client knew unmapped subsurface utilities existed...
Read More