Comprehensive Well Pad Design

RETTEW facilitated the design, permitting, and construction of a horizontal well pad for an oil and gas client. The project posed a series of complex challenges that our team navigated to ensure compliance with regulations set forth by the Ohio Department of Natural Resources under Chapter 1501:9 of the Ohio Administrative Code.

Throughout the project, we addressed the specific needs of the site, including considerations such as well spacing, equipment layout, traffic flow, and turning radius requirements. Additionally, the site had challenges related to bearing capacity and factor of safety, requiring us to create a design that met operational demands.

Although the site itself was not within a designated floodplain, the project encountered unique topographical features that necessitated careful planning. Our geotechnical investigation revealed a high water table, prompting us to design toe-key drains capable of functioning effectively in saturated conditions while ensuring minimal disruptions to ongoing operations at the site.

RETTEW delivered a tailored solution that addressed our client’s needs through attention to detail and a comprehensive understanding of both regulatory standards and site-specific constraints.

RETTEW NEWSROOM

Check out our latest updates on industry trends, corporate news, employee accomplishments, and community support.

Go to Newsroom

Funding

Focus on Funding – July 2026

No need to test your luck at the midway. This month’s funding opportunities offer a chance to turn big ideas into reality. So, step right up and take the next ride toward funding your project!

Read More

Internships

ASPIRE Intern Blog: Behind Every Laptop Upgrade

By Tom Tarnacki, ITS Technician Assistant – Intern (Summer 2026) At RETTEW, the ITS Team doesn’t settle for…

Read More