1. City of York Biogas Piping Repair and Improvements

    The City of York operates a 26-mgd advanced wastewater treatment plant, providing service to the greater York region. As part of its sludge handling processes, the City employs anaerobic digestion and combusts the accumulated biogas to produce electricity to meet the facility’s needs. To ensure optimal performance of the biogas piping, the City hired RETTEW…

  2. Former Federal Mogul/NTN-BCA Ball Bearing Manufacturing Facility Decommissioning Assessment

    RETTEW completed an industrial site decommissioning assessment of the 30-acre Federal Mogul/NTN-BCA former ball bearing manufacturing facility, including a 277,000-SF industrial building. When fully operational, manufacturing processes at the site included heat treating, hardening, honing and grinding, and product assembly. These operations used a number of materials, most notably quenching oils (mineral oil used in…

  3. Steel Mill Maintenance Services

    An industrial steel client needs to ensure its mill is fully operational at all times. When there is a problem in one part of the mill, it can idle the entire facility until they can resolve it. To fulfill this need at their plant, our client required an engineering staff to solve complex facility maintenance…

  4. Wenger’s Feed Mill Secondary Containment Modifications

    Wenger’s Feed Mill, an agricultural feed processing and distribution company, had a problematic leak coming from a 10,000-gallon liquid fat above-ground storage tank, prompting the need to modify the mill’s existing secondary containment. The tank needed to be removed and demolished, and the remaining secondary containment area required patching and sealing to prevent leaks that…

  5. High-Angle Utility Locating

    A high-pressure natural gas pipeline located in a right-of-way between two existing pipelines required inspection to evaluate potential flaws and any need for repair. Prior to excavation, the client needed to adhere to PA One Call requirements to mark their assets. A portion of the right-of-way was brush- and snow-covered steep terrain, creating accessibility challenges…

  6. Pad Work

    Our exploration and production client came to RETTEW with critical needs for dedicated, professional field staff to manage their northern Marcellus operations. The client needed efficient supervision and help with traffic management to keep their production on schedule while maximizing space and processes. RETTEW maintained 24/7 site operations at this location for over a year,…

  7. Aethon Energy Management Water Treatment Facility Design

    Aethon Energy Management, LLC, owns and operates natural gas and oil assets in the Wind River Region of Central Wyoming, including more than 250 active wells. As part of their efforts to field-produce water in a long-term, sustainable fashion, and provide cost-effective disposal, they constructed a 25,000-bbls/day advanced water treatment facility. The facility produces a…

  8. Tobyhanna Army Depot Design-Build Radome

    Tobyhanna Army Depot is the designated site for repairing and testing Marine Corps radars. To accommodate upcoming work on an AN/TPS-59 long-range air surveillance radar antenna, Tobyhanna needed to complete a series of multi-million dollar construction renovations. For this particular project, the government budgeted to equip the depot’s industrial complex with a new radome used…

  9. Quaker Compressed Natural Gas Terminal

    A natural gas client had developed a unique solution to provide compressed natural gas (CNG) to commercial/industrial facilities that do not have access to natural gas pipelines: offering CNG at a competitive price by trucking the CNG in specially designed tractor trailers. The trailers would then be parked at the customer’s site and the CNG…

RETTEW NEWSROOM

Check out our latest updates on industry trends, corporate news, employee accomplishments, and community support.

Go to Newsroom

Employee Update

BJ Batterson Promoted to Vice President of Facilities and Construction

RETTEW is pleased to announce the promotion of BJ Batterson to Vice President of our Facilities & Construction…

Read More

Uncategorized

Paradise Township Sewer Authority Breaks Ground on Wastewater Treatment Plant Expansion

On May 5, the Paradise Township Sewer Authority broke ground on its recently funded wastewater treatment plant expansion…

Read More