1. Hamilton Streetscape

    Hamilton Street is the City of Allentown’s main thoroughfare in the Business District, and like in many older cities, its pedestrian streetscape was a hodgepodge of various improvement projects constructed by different consultants over a time span of 50-plus years. Accordingly, it had no uniform theme of landscaping or pedestrian amenities, and ADA accessibility varied…

  2. Artswalk Court Street

    Court Street was a typical urban alley with narrow sidewalks, poor lighting, and poor pavement. These conditions made driving and walking an unpleasant experience, with pedestrians usually walking in the middle of the alley in conflict with vehicles. Unfortunately, this alley was within the City’s Art’s District and provided a direct shortcut link between several…

  3. 2300 South Penn Avenue Industrial Site Redevelopment

    Logistics Property Company, LLC, is redeveloping a former industrial site containing arsenic-contaminated soil. Before work could begin, the contaminated soil was removed and clean fill was added, as specified in the Pennsylvania Department of Environmental Protection’s (PA DEP) Management of Fill policy. Additionally, RETTEW managed the imported materials and put engineering controls in place, including…

  4. Chiques Creek Pollutant Reduction and Manheim Loop Greenway

    Manheim Borough identified a 3,040-LF floodplain restoration/sediment removal/riparian buffer project along a section of the Chiques Creek in Memorial Park to comply with current MS4 Permit requirements. The project is expected to reduce the existing sediment load to Chiques Creek by approximately 136,000 pounds per year and achieve the required 10 percent sediment reduction required…

  5. Stony Battery Road Distribution Corridor

    Catalyst Commercial Development, LLC (CCD), planned to develop a commercial distribution corridor in East Hempfield and West Hempfield Townships comprising three distribution facilities to serve the needs of South Central Pennsylvania. The 57-acre site is surrounded by industrial facilities, residential communities, vacant land, and a railroad. It was essential to consider the three sites in…

  6. Anaerobic Digestion to Renewable Natural Gas Project Development

    An energy client was looking to develop multiple renewable natural gas (RNG) projects to meet their corporate sustainability goal of reducing the carbon footprint of the natural gas grid through RNG. These projects will generate biogas that can be upgraded to RNG on site. The feedstocks for this program are agricultural wastes such as dairy…

  7. Farmdale-Ferndale Storm Sewer Improvements

    West Hempfield Township was looking to pave the streets in one of its neighborhoods as part of a capital improvement project. The neighborhood was built in the 1970s and the existing stormwater infrastructure was also in need of repair and/or replacement. RETTEW worked with the Township to analyze the existing pavement, curbing, and stormwater facilities…

  8. University Area Joint Authority Biosolids Processing Facility Upgrade

    The University Area Joint Authority’s (UAJA) Spring Creek Pollution Control Facility provides wastewater treatment, solids handling, and reuse water to the Centre Region and comprises an advanced wastewater treatment facility with tertiary effluent standards and advanced water reclamation. The facility is currently rated for 10.56 mgd hydraulically (MMAF) and 50,000 pounds/day of biochemical oxygen demand….

  9. Conewago Township Park Master Plan

    RETTEW developed a master site plan for Conewago Township’s community park for an undeveloped tract of approximately 103 acres to include both passive and active recreation facilities. Key facilities included pavilions and restrooms; tot lots; a parking lot; a 60-foot softball and Little League baseball field; two U10 soccer fields; a paved multipurpose/exercise trail; basketball,…

  10. Piedmont Lake Boat Launch Ramp Parking Area

    RETTEW was selected by the Muskingum Watershed Conservancy District (MWCD) to design a parking lot and boat launch expansion project at Piedmont Lake. The goal of the project is to provide 50 parking spaces for trailers and additional regular vehicle spaces, handicap-accessible parking, restroom facilities, ADA-compliant ramps and access, bioretention areas, lighting design, and a…

RETTEW NEWSROOM

Check out our latest updates on industry trends, corporate news, employee accomplishments, and community support.

Go to Newsroom

Uncategorized

Paradise Township Sewer Authority Breaks Ground on Wastewater Treatment Plant Expansion

On May 5, the Paradise Township Sewer Authority broke ground on its recently funded wastewater treatment plant expansion…

Read More

Industry News

Not Everything Gets Better with Age!

Some things improve as they get older, but when it comes to our country’s aging infrastructure, the opposite…

Read More