1. Paper Mill On-Site Safety Consulting

    Recognizing the need to mitigate any safety issues during a $70 million construction project at a paper mill, the mechanical contractor working on the project requested on-site safety observation to document and recommend improvements to their construction safety methods. Between serving as part-time and full-time on-site safety consultant, as well as overseeing lock-out and tag-out,…

  2. Pharmaceuticals Facility Shutdown Safety Oversight

    A major pharmaceuticals company planned to shut down their facility for three weeks to perform maintenance and install new equipment. With the shutdown requiring 24/7 safety coverage during the process, RETTEW was hired to provide oversight and evaluations of the work area. We offered full coverage for the staff — electricians, engineers, utility crews, welders,…

  3. CNH Industrial Finished Goods Yard Paving Feasibility Study

    When manufacturing capital goods for the agricultural, construction, and commercial markets, it’s essential your facility has a stable yard for storage. CNH Industrial manufactures everything from tractors and combines to firefighting and civil protection vehicles. And with recurring rutting, soft areas, and mud throughout their finished goods yard, they needed economical pavement options to correct…

  4. Food Manufacturing Facility Conceptual Exhibit

    This industrial client was interested in numerous site and facility improvements such as expanding their existing manufacturing plant footprint, adding a new employee parking lot and entrance, relocating a driveway and truck scale, and adding new truck bays and loading docks. To help conceptualize these projects and gain approval from corporate headquarters, management at this…

  5. Food Manufacturing Facility Upgrade Design

    This food manufacturer was looking to expand their plant with various site and facility improvements. After RETTEW completed a 3D model of the proposed improvements under a previous contract, the client engaged us for this first phase of design. The project includes a new hygienics building, relocation of the existing engineering building, and relocation of…

  6. Alcoa Lancaster Works Improvements

    Home to Alcoa since the late 1940s, the Lancaster Works plant is a leader in aluminum production, specializing in a wide assortment of aluminum sheet and cast plate products. Alcoa is committed to continually upgrading and making modifications at its 1.3 million-SF plant, which gives them a tremendous advantage in producing quality products for their…

  7. Kline’s On-Call Wastewater Treatment Operations Consulting

    Kline’s Services helps municipal, commercial, industrial, and residential clients manage their wastewater needs. As their business grew, they experienced an increase in wastewater volumes and treatment requirements. Their existing treatment plant, however, suffered periodic upsets. They needed a solution to continue providing wastewater services to their diverse clientele. RETTEW provided on-call, on-site operations and engineering…

  8. C&D Technologies Industrial Facility Decommissioning

    C&D Technologies was pursuing a potential property sale and required industrial decommissioning on a very strict budget. Previously functioning as a battery manufacturing plant, the location required complete decontamination of plant equipment, the facility, and the ground in advance of possible building demolition. The client needed the work completed quickly and without safety incident. Lead…

  9. Joy Cone Adsorption Chiller Study

    Joy Cone Company is the nation’s leading manufacturer of ice cream cones – and the largest cone company in the world. Their two U.S. facilities produce more than 1.5 billion cones annually for retail and food service venues, so operational efficiency is paramount. At their 521,000-SF eastern manufacturing plant, Joy Cone was considering a large…

  10. Case New Holland Equipment Test Cell

    Case New Holland, a world leader in the agricultural and construction equipment business, needed a new facility to test harvesting equipment with 1,000-horsepower engines running under full loads for days at a time. The facility required a special room to give the client the flexibility to test multiple equipment configurations and various pieces of equipment….

RETTEW NEWSROOM

Check out our latest updates on industry trends, corporate news, employee accomplishments, and community support.

Go to Newsroom

Services

An MS4 EOR Contract

Our first MS4 Engineer of Record appointment. RETTEW was recently named MS4 Engineer of Record for Penn Township…