-
Replacing this twin-barrel arch bridge on a heavily traveled corridor posed significant challenges because of the limited crossings of the waterway and the need to maintain traffic flow. RETTEW designed a two-span replacement bridge on a curved alignment to address these issues. To ensure continuous traffic flow during construction, we implemented a staged construction approach…
-
Susquehanna Ford needed to move their operations to a new site to meet corporate standards and expand their operations. RETTEW helped redevelop a former automobile service center and vacant lot along Route 272 into a new Ford dealership and service center. Working closely with a design-build firm on the site design, RETTEW provided land development…
-
The intersection of SR 172 and Perry Drive was on Ohio’s Governors priority list of the top ten most dangerous intersections in the state and needed significant upgrades to increase safety for motorists. During construction, the prime engineer required the expertise of a subconsultant to develop signal timings for phases of temporary traffic conditions. Having…
-
South Londonderry Township, through its comprehensive plan, identified the need to provide a safe integration of travel for motorists, pedestrians, and bicyclist. The plan identified two distinct classifications in the township: Urban and Rural. In the Urban areas, the plan called for the Township to retrofit some pedestrian linkage with nearby civic uses, schools, commercial…
-
RETTEW performed the design of this $3.1 million overhead bridge project carrying Nissley Drive (renamed Baker Avenue as part of the project) over the turnpike mainline. We completed an alternative analysis to replace this rigid-frame structure with a two-span bridge and accommodate future widening of the mainline. In addition to the structure design, RETTEW developed…
-
Based on a previously prepared roadway safety audit, Pennsylvania Department of Transportation (PennDOT) District 8-0 requested safety enhancements at 13 locations along a 3.9-mile-long section of SR 0241’s two-lane roadway. Improvements included enhancing sight distance; updating signage, signals, and pavement markings; improving the alignment to eliminate an S-curve; and modifying an intersection to incorporate a…
RETTEW NEWSROOM
Check out our latest updates on industry trends, corporate news, employee accomplishments, and community support.
Go to NewsroomOff the Clock With Beth Watkins
Tell us about a hobby you’re passionate about outside of work. I belong to a volunteer women’s service…
Read MoreTo Inspire and Empower
One of RETTEW’s Project Managers, Melissa Kelly, is participating as a mentor in the Lancaster Chamber of Commerce…
Read More